Abstract

The reason for the discrepancy between proved oil reserves and its real production rate was an inaccurate geological model of the reservoir. Reinterpreted well-logs, built new geological maps with regards to the erosion boundary, and a new 3D geological model resulted as a newly estimated reasonable oil reserves. To sum up, oil net pay within the reservoir A is extended approximately by 25 %. The oil productive area has grown up and total amount of oil reserves increased by 125 %.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20131118
2013-06-10
2024-03-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20131118
Loading

Most Cited This Month Most Cited RSS feed