This is to present case studies conducted for Chevron’s Environmental Technology Unit off the coast of North West Australia. Two sorties, first a METOC survey followed by a detailed Turbidity study was conducted over 2 months (Dec 2012 and Jan 2013) to collect baseline data as pre-site survey prior to the start of a full scale dredging operation to lay a pipeline.