1887
PDF

Abstract

A dual horizontal oil producer completed in offshore Abu Dhabi faced unplanned faults while drilling the 8.5” pilot hole, resulting in complete losses. Based on this event, deployment of radioactive sources in the horizontal section presented highly risky geosteering operations, potentially leading to extensive fishing operations in case of a stuck pipe. The alternative technology adopted was to utilize a high resolution LWD resistivity imaging tool for wellplacement applications and reservoir characterization in a water based mud system. The case study achieved increased production due to maximizing reservoir contact by utilizing accurate realtime dip picking and together with qualitative at-bit resistivity measurements.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20131564
2013-09-22
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20131564
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error