1887

Abstract

Optimum development plans for major oil and gas fields require solid integrated subsurface description. Defining geological, petrophysical, reservoir engineering, and drilling uncertainties is essential to select the optimal development concept for reservoir depletion plan. Hence, well placement and geosteering of injector/producer horizontal wells has a significant impact on maximizing reservoir contact and thus exploit productivity and sustainability of new delivered wells.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20131576
2013-09-22
2024-03-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20131576
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error