1887

Abstract

In geocellular reservoir modelling, the final vertical increment scale of the grid size is a compromise between the preservation of observed reservoir heterogeneities and what is practical for simulation purposes in terms of the total number of active cells in the dynamic model. The challenge is to preserve the heterogeneity of the initial petrophysical rock property modelling throughout the upscaling process without introducing an artificial bias to the observed property trends.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20132042
2013-11-17
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20132042
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error