1887

Abstract

In this paper we discuss how the use of various dynamic data and dynamic measures of success can be used to improve the upscaling and history matching of reservoir simulation models, and in this way close the loop between production operations that generate this data and the geo-modelling & reservoir simulation that consume it.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20132050
2013-11-17
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20132050
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error