1887

Abstract

The most commonly used methods to predict fluid pressure before drilling are based on seismic velocities. Although geopressure is predicted successfully in some cases using seismic velocities with sufficiently high-resolution, these methods are applicable

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201400064
2009-06-08
2021-10-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201400064
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error