1887

Abstract

Harding Central is a high permeability turbidite reservoir in the central North Sea. It has been produced since 1996 with water injection for pressure support and gas injection for disposal of evolved gas. The initial oil in place volume has been tightl

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201400266
2009-06-08
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201400266
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error