1887

Abstract

Cross-disciplinary communication between specialized E&P projects should be facilitated by a conceptual framework that can be used at different levels of abstraction. In this framework an unbiased strategy need be followed, meaning that parameterization of the subsurface model must be delayed as much as possible. One consequence of delayed parameterization is that velocity models should not drive the seismic processing algorithms.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201405877
2003-08-31
2024-10-09
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609.201405877
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error