1887
PDF

Abstract

Currently the principal problems in the construction of 3D models for reservoir applications are: • The complexity of the model building proces and the difficulty of iterating the process. • The time required defining the model and the computational time to build it. • The accuracy of the geometry and correctness of the topology of the model constructed. This paper describes the details of a new gridding method that is an extension of the POSC-Rescue multiblock approach. The details of the method and lts advantages will be described and discussed.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201405919
2002-09-03
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201405919
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error