1887
PDF

Abstract

This paper demonstrates that simulation of models of up to 10 million cells can be performed by means of parallel simulation. This allows both geologists and reservoir engineers to include more realistic geological detail for better and more reliable production optimization.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201405950
2002-09-03
2024-12-03
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609.201405950
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error