70 km long section of a highway was investigated using georadar for detecting possible cavities under the concrete pavement. The highway was built more than 20 years ago and the available documentation about the construction is not perfect enough. The prospecting was carried out before the planned reconstruction of the road with the purpose of estimating the amount of refilling material necessary for the reinforcement of the pavement.