1887

Abstract

70 km long section of a highway was investigated using georadar for detecting possible cavities under the concrete pavement. The highway was built more than 20 years ago and the available documentation about the construction is not perfect enough. The prospecting was carried out before the planned reconstruction of the road with the purpose of estimating the amount of refilling material necessary for the reinforcement of the pavement.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201406288
2000-09-06
2024-04-24
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201406288
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error