During the second phase of Infill Drilling (Phase 2 IFD) at Wytch Farm, a 460HP workover rig converted four existing wells to > 1km departure horizontal multi-lateral wells. The project was a complete success technically, economically, and in terms of HS&E performance , productivity and oil recovery.