1887

Abstract

The Zafiro Field has gained some renown within the industry as a fast track project, with less than 18 months from discovery to first production, in moderately deep water, remote from infrastructure. The application of technology made both the initial fast track and ongoing rapid development possible.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201406608
1998-10-03
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201406608
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error