BEB operates six steam drive projects in Northwest Germany with a total of 18 steam injectors and 140 producers in two oilfields (25° API, 120-140 mPa•s). The first project, Georgsdorf SD1, was started in 1975 and until mid 1996 about 0.75 pore volumes (PV) of steam have been injected. Earlier analyses showed that the oil steam ratios peaked at an injection volume of 0.35 PV and were slowly decreasing afterwards. However, there was no experience on when to end steam injection and how to proceed in the most efficient way. Since the few accessible case histories were not directly applicable, simulation models were used to analyse some key issues, listed below, which are critical to the future economics of all steam drive projects.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201406807
1997-10-20
2024-04-18
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201406807
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error