Abstract

The surfactant test initiated in a GulIfaks Well in January 1991¹, was interrupted before surfactant injection due to operational problems in the well. Based on this experience, a new well was identified, and a single well surfactant injection test was planned and conducted during the first half year of 1992. The results, and a discussion of both the results and the experiences, are presented for the two well operatons.