1887
PDF

Abstract

The development program for processes to reduce watercut during production of the lower Brent reservoir unit of the Gullfaks field culminated by a large scale injection of alkaline Na-silicate gel in a lower Brent production well during summer 1993. The operation was prepared and designed through an extensive laboratoiy program as well as small scale onshore field tests.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201406972
1995-05-15
2024-12-06
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609.201406972
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error