1887
PDF

Abstract

Traditionally, field prospecting and reserves evaluation is carried out by drilling, involving structural maps according to seismic data. But if a reservoir has a complicated shape because of tectonic faults, lithological replacements, erosional processes, dry wells drilling risk repeatedly increases. To increase the exactness of bore getting into bed and (to increase) reserves evaluation exactness it is necessary to use computer methods of reservoir geological models construction while drilling. It is computer methods that provide operative and suitable combination of drilling, geology and geophysics data.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201407007
1994-09-25
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201407007
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error