1887
PDF

Abstract

The UK's first electrical monitoring system to be permanently installed below the geomembrane liner of a landfill site has now been operational for two years. The system, developed jointly by Aspinwall and Company, the University of Birmingham and Campus Geophysical Instruments, is installed at a site operated by Cleanaway Ltd and consists of a basic 20 m grid of electrodes emplaced below a 0.3 m layer of Bentonite enriched sand (BES), underlying a 2.5 mm thick HDPE geomembrane liner. Similar systems have been developed and used in the United States (e.g. Van et. aL, 1991), and elsewhere in Europe (e.g. Frangos, 1994).

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201407327
1997-08-09
2024-04-24
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201407327
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error