1887
PDF

Abstract

The need to fulfill a long term Gas Sales Agreement, dictates drilling two infill rate acceleration wells in 1999. Improved imaging through and beneath a gas chimney is needed to lower the risk on any wells drilled. A fast method of improving the imaging is needed to properly place the welIs.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201408216
1998-06-08
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201408216
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error