1887
PDF

Abstract

The high costs of seismic exploration leaves no room for mistakes. Seismic planning (i.e. acquisition and dedicated processing strategies) must be optimized for the Exploration and Production needs and for Geophysical requirements.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201408221
1998-06-08
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201408221
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error