1887

Abstract

I'm sorry, but I don't have time to spare to come to the contractor" Sadly, this sentence is repeated many times in oil company offices when it is suggested that an interpreter should spend some time reviewing intermediate results from a 3D seismic processing project. The case histories presented here demonstrate that an interpreter's familiarity with the seismic and geological data from an area makes his or her input into the processing strategy and decision making essential to ensure optimum results.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201410098
1994-06-10
2020-03-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201410098
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error