1887

Abstract

A new reservoir model is currently being built on a field located in deep water environment. During<br>summer 2008, a 4D seismic was acquired over this field in order to monitor reservoir changes due to<br>almost 2 years of production and injection. After in-house warping techniques were applied on<br>seismic monitor data, interpretation provided very valuable information for reservoir management,<br>even with Fast-Track processing data: operations on wells were planned, current reservoir model was<br>updated, understanding of communication inside and between reservoirs was improved. A dedicated<br>4D interpretation on Full Processing 4D data was performed in order to integrate 4D information into<br>the new reservoir model. 4D interpretation was calibrated with usual dynamic monitoring data such as<br>MDT, PLT and fluid fractions evolution at wells.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201410328
2011-04-04
2024-04-20
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201410328
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error