1887
PDF

Abstract

A test track built by the official research center of the Spanish Ministry of Public Works (CEDER) came into operation in January 1988 . The track constituted by two 75 m long straight sections connected by two curves has an oval shape and a total length of 304 m . It stands on a concrete box 8 wide and 2 .60 m deep .

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201410379
1992-06-01
2023-09-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201410379
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error