1887
PDF

Abstract

Among the great number of existing tomographical methods, it is necessary to make a choice adapted to each type of application. A trade-off must always be considered between the type and the number of data, the accuracy required and the cost. For our applications, at the scale of measurement relevant to civil engineering, we wish to deal with a great number of data, which may be very noisy and we must be able to apply our methods to the large amount of possible geometrical configuration including 3D measurements.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201410505
1992-06-01
2024-04-19
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201410505
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error