1887

Abstract

This paper presents an overview of the improved oil recovery projects under planning, design or application stages by Turkish Petroleum Corporation (TPAO). These are two field wide inmiscible CO2 injection and a field wide waterflood projects.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201411275
1991-05-21
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201411275
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error