1887

Abstract

Summary

When planning horizontal wells, geological and hydrodynamic 3D-models based on seismic and well log data are usually used. To build a field model with the desired level of accuracy and optimize well drilling and development geosteering and geomodeling should be integrated as they are closely interconnected. Realization of the geological model according to geosteering data in real-time provides more detailed information of the geological structure around drilling wells, and this can be acted upon while drilling. This will help to correct the planned trajectory for the well placement in the most producing interval. The field situated in Western Siberia is an example of geosteering and geomodeling integration described in this paper.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201414338
2015-10-20
2024-03-29
Loading full text...

Full text loading...

References

  1. РукачевИ.В., КоманькоП.М.
    [2015] Результаты применения глубинных азимутальных электромагнитных измерений в комплексе каротажа во время бурения скважин с горизонтальных окончанием в сложных геологических условиях. Техническая презентация, SPE Moscow Section, 14Апреля2015г.
    [Google Scholar]
  2. РябовЮ.Н., КоманькоП.М.
    [2015] Опыт применения каротажа в процессе бурения при геонавигации горизонтальных скважин в сложных геологических условиях. М: «Нефтесервис», №1(28), 2015. С. 27–30.
    [Google Scholar]
  3. ЗакревскийК.Е.
    [2009] Геологическое 3D Моделирование. М: ООО «ИПЦ «Маска», 2009-376 с.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201414338
Loading
/content/papers/10.3997/2214-4609.201414338
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error