1887
PDF

Abstract

This paper reviews alternative approaches to play assessment. The review covers both discrete (conventional) and continuous (unconventional) plays. There is a significant literature on the former topic (and also a range of more or less well established methods/approaches). For continuous resources we are looking at an emerging field that can benefit from a systematic review -- in order to be able to both adopt and adapt from assessment of discrete resources. The main body of the paper provides a review of alternative play assessment methods. The review concludes with a summary overview of key differences and similarities between the approaches used for assessing respectively discrete and continuous resources. Some of the key dimensions considered are interpretation of shared play risks and conditional risks, how to model recovery, the key inputs from analogs and the role of the assessment unit.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20143884
2012-02-13
2024-03-28
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20143884
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error