1887

Abstract

Petrobras is installing its first offshore PRM system in Jubarte Field, Campos Basin, Brazil. The water depth at the target area - which has 9 sq km and around 30 km OBC length -is approximately 1,250 meters. 6 years R&D prepared the company to propose a project to the market for the full solution, since project the system, manufacturing the equipment up to acquisition and data processing, should be presented. Petrobras main target is to reduce project/acquisition/processing/interpretation cycle time. The presented solution is is fully optical, using inferometers as sensors and telemetry. Topside preparatory equipments were installed at P-57 FPSO platform, and subsurface system will be installed end/2011-begining 2012.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20145208
2011-02-28
2024-04-25
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20145208
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error