We found out gas is producing from the beginning section of open hole interval. We recognized this happened after increasing the wellhead choke size in order to increase oil production without bearing in mind that the field is natural fracture carbonate reservoir which has very large numbers of vertical and horizontal fractures in reservoir rock. Also in spite of starting gas injection project, pressure drop continued to increase as a result of increasing oil production rate which caused more oil loss. Consequently gas oil contact has gone down and we had additional gas production in our producing wells.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20145948
2009-05-04
2024-03-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20145948
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error