By August 2014 a full Permanent Reservoir Monitoring system was installed on the seafloor at the Grane field.Thirteen months later, in September 2015, three full field surveys have been acquired.

The requirements for high data quality, frequent acquisition and expected turnaround for acquisition and processing have been retrieved. Preliminary processed data have been delivered few weeks after last shot was acquired. Production effects are observed and confirm the usability and ability of frequently acquire high quality 4D seismic data.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201600573
2016-05-30
2024-04-24
Loading full text...

Full text loading...

References

  1. RoyS.S, BøenF., SæbøA., AanonsenS.I.
    [2011] 4D Seismic Monitoring - A Case Study on the Grane Field, North Sea. EAGE 73rd Conference & Exhibition 2011.
    [Google Scholar]
  2. RoyS.S, Faust AndersenC., EldeR., BøenF., SæbøA.
    , [2015] Grane PRM Project - Following the Footsteps of a successful 4D story. EAGE 77th Conference & Exhibition 2015.
    [Google Scholar]
  3. ThompsonM., AndersenM., EldeR.M., RoyS.S., SkoglandS.M.
    [2015] The Startup of Permanent Reservoir for Snorre and Grane. EAGE 77th Conference & Exhibition 2015.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201600573
Loading
/content/papers/10.3997/2214-4609.201600573
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error