1887

Abstract

Summary

This work reviews an example of water injection planning with respect to Irkutsk Oil Company carbonate reservoir. Pilot water injection, 4D electric survey, reservoir simulation are considered as a methods reducing geological uncertainties. Basic research compilation are basic to establish waterflooding target performance.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201802026
2018-08-11
2024-03-29
Loading full text...

Full text loading...

References

  1. Applied waterflood field development, DonWolcott, Energy Tribute Publishing, 2009;
    [Google Scholar]
  2. O.Salako, C.MacBeth, L.MacGregor. Potential applications of time-lapse CSEM to reservoir monitoring. First break volume 33, April2015
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201802026
Loading
/content/papers/10.3997/2214-4609.201802026
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error