1887

Abstract

Summary

The presented report discusses the results of a survey of the technical condition of the unfinished construction of a road tunnel on the object: Bashkortostan - a new exit from the city of Ufa to the federal highway M-5 “Ural” (Eastern exit).

The purpose of the work was to study the engineering geological and hydrogeological conditions within the zone of interaction of the enclosing mountain massif and all previously executed parts and tunnel elements to obtain the initial data necessary to verify the compliance of the design documentation and to assess the possibility of their further use during the continuation of construction and future accident-free operation or the need for their replacement, restoration, repair and reinforcement. Note that to date, along the route of the future tunnel from the beginning of construction (2001), three parallel galleries from the western portal have been traversed for a distance of about 900 m. Up to the design position of the eastern portal, about 200 m have been drilled. The side of the tunnel is partly finished by finishing, the rest - temporary.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201802459
2018-09-09
2024-04-19
Loading full text...

Full text loading...

References

  1. PisetskyV. B., VlasovV. V., CherepanovV. P., AbaturovaI. V., ZudilinA. E., PatrushevY. V., AleksandrovaA. V.
    . Forecast of the stability of the mountain massif based on the method of seismic location in the processes of construction of underground structures // EAGE, “Engineering Geophysics 2014”, Gelendzhik-2014. “Engineering survey”. PNIIS. №7. 2014- C. 46–51.
    [Google Scholar]
  2. PisetskiyV. B., LapinE. S., AbaturovaI. V., ZudilinA.
    Evaluation of the structure and parameters of the stressed state of a mountain massif in the construction of underground structures // Mining Journal. 2014. No. 9. P. 45–47.
    [Google Scholar]
  3. PisetskiyV. B., LapinE. S., AleksandrovaA. V., LapinS. E.
    To the task of formulating general requirements and practical implementation of the seismic system for monitoring and forecasting sudden outbursts and rock strikes // Labor Safety in Industry. № 12. - 2013. - C. 49–57/
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201802459
Loading
/content/papers/10.3997/2214-4609.201802459
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error