1887

Abstract

Summary

We consider the successful experience of using flexible tubing technology when conducting multi-stage hydraulic fracturing in wells with horizontal completion located in sediments with hard-to-recover oil reserves using the example of Bazhenov Formation and AC3 formation in Western Siberia. The successful experience of combined use of coiled tubing and reusable sleeves, simultaneous use of hydraulic fracturing fleets and coiled tubing fleets is shown.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201901852
2019-05-27
2024-03-28
Loading full text...

Full text loading...

References

  1. БочкаревА.В., БуденныйС.Д., НикитинР.Н., МитрушкинД.А., ЕрофеевА.А., ЖуковВ.В.
    Создание оптимального дизайна многостадийного гидроразрыва пласта с учетом особенностей залежей баженовсокй свиты // «Нефтяное хозяйство» - 2017 - №3 – P. 50–53.
    [Google Scholar]
  2. BochkarevА.V., BudenniyS.D., NikitinR.N., MitrushinD.А., ErofeevА.А., ZhukovV.V.
    Sozdanie optimalnogo dizaina mnogostadiynogo gidrorazriva plasta s uchetom osobennostiy zalezhey bazhenovskoy sviti // «Neftianoe hoziaystvo» - 2017 - №3 – P. 50–53.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201901852
Loading
/content/papers/10.3997/2214-4609.201901852
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error