1887

Abstract

Summary

An algorithm for calculating a multistage hydraulic fracturing for a horizontal well is proposed. An analysis of various methods for calculating the flow rate of horizontal wells was carried out: Joshi, Dikken, Guo. In result, models, that give the most approximate result to the production data, were chosen. Also method of calculating the optimal number of fractures in a multi-stage hydraulic fracturing was tested. All calculations were made for the conditions of the oil and gas condensate field of the Yamal-Nenets autonomous district.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201901878
2019-05-27
2024-04-23
Loading full text...

Full text loading...

References

  1. Батлер, Р. М.
    [2010] Горизонтальные скважины для добычи нефти, газа и битумов. Институт компьютерных исследований, НИЦ «Регулярная и хаотическая динамика», Ижевск, Россия, 536.
    [Google Scholar]
  2. Бердин, Т.Г.
    [2001] Проектирование разработки нефтегазовых месторождений системами горизонтальных скважин. ООО «Недра-Бизнесцентр», Москва, 199.
    [Google Scholar]
  3. Близнюков, В.Ю. и Стельмак, Р.В.
    [2006] Обоснование оптимальной длины горизонтального участка скважины. Строительство нефтяных и газовых скважин на суше и на море, 7, 4–5.
    [Google Scholar]
  4. ГуоБоюн
    [2008] Оценка продуктивности горизонтальных и многоствольных скважин. Учебный курс OAO НК «Роснефть», Москва.
    [Google Scholar]
  5. Fadairo, A. S.
    Adesina [2011] Modeling Productivity Index for Long Horizontal Well, 1–9.
    [Google Scholar]
  6. Joshi, S.D.
    [1991] Horizontal Well Technology. Oklahoma, 533.
    [Google Scholar]
  7. Кременецкий, М.И., Габдраширов, Э.Ф. и Никурова, Л.Ф.
    [2009] Расчет дебита бокового горизонтального ствола. Нефтяное хозяйство, 12, 41–44.
    [Google Scholar]
  8. Orodu, O., Fadiaro, A. and Enebeli, E.
    [2012] Realistic optimization of well length for horizontal drilling. Brazilian journal of petroleum and gas, 6(2), 53–65.
    [Google Scholar]
  9. Ёлкин, С.В., Алеворев, А.А. и Веременко, Н.А.
    [2016] Опыт проведения экспресс-оценок дебита горизонтальных скважин после многозонного гидроразрыва пласта. Инженерная практика, 12, 42–57.
    [Google Scholar]
  10. Желтов, Ю.П.
    [1985] Сборник задач по разработке нефтяных месторождений. Недра, Москва, 296.
    [Google Scholar]
  11. Batler, R. M.
    [2010] Gorizontal'nye skvazhiny dlya dobychi nefti, gaza i bitumov. Institut komp'yuternyh issledovanij, NIC «Regulyarnaya i haoticheskaya dinamika», Izhevsk, Rossiya, 536.
    [Google Scholar]
  12. Berdin, T.G.
    [2001] Proektirovanie razrabotki neftegazovyh mestorozhdenij sistemami gorizontal'nyh skvazhin. OOO «Nedra-Biznescentr», Moskva, 199.
    [Google Scholar]
  13. Bliznyukov, V.YU. i Stel'mak, R.V.
    [2006] Obosnovanie optimal'noj dliny gorizontal'nogo uchastka skvazhiny. Stroitel'stvo neftyanyh i gazovyh skvazhin na sushe i na more, 7, 4–5.
    [Google Scholar]
  14. GuoBoyun
    [2008] Ocenka produktivnosti gorizontal'nyh i mnogostvol'nyh skvazhin. Uchebnyj kurs OAO NK «Rosneft'», Moskva.
    [Google Scholar]
  15. Fadairo, A. S.
    Adesina [2011] Modeling Productivity Index for Long Horizontal Well, 1–9.
    [Google Scholar]
  16. Joshi, S.D.
    [1991] Horizontal Well Technology. Oklahoma, 533.
    [Google Scholar]
  17. Kremeneckij, M.I., Gabdrashirov, EH.F. i Nikurova, L.F.
    [2009] Raschet debita bokovogo gorizontal'nogo stvola. Neftyanoe hozyajstvo, 12, 41–44.
    [Google Scholar]
  18. Orodu, O., Fadiaro, A. and Enebeli, E.
    [2012] Realistic optimization of well length for horizontal drilling. Brazilian journal of petroleum and gas, 6(2), 53–65.
    [Google Scholar]
  19. Yоlkin, S.V., Alevorev, A.A. i Veremenko, N.A.
    [2016] Opyt provedeniya ehkspress-ocenok debita gorizontal'nyh skvazhin posle mnogozonnogo gidrorazryva plasta. Inzhenernaya praktika, 12, 42–57.
    [Google Scholar]
  20. Zheltov, YU.P.
    [1985] Sbornik zadach po razrabotke neftyanyh mestorozhdenij. Nedra, Moskva, 296.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201901878
Loading
/content/papers/10.3997/2214-4609.201901878
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error