1887

Abstract

Summary

Well 2 is 4 branches fishbone with total reservoir exposure 3100 m The drillability of final design decisions is proven and wells are brought into operations. The better result is shown by Well 1: the productivity index is more, then expected from numerical simulation. Extended well test is in progress. Build up test show, that 64% of well is in production"

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202154037
2021-05-24
2024-03-28
Loading full text...

Full text loading...

References

  1. 1.ЕмельяновД.В., ЖарковА.В., СмирновД.С., ГлебовА.С., ЛиходедИ.А.«Современные подходы к сопровождению бурения горизонтальных скважин для низкопроницаемых объектов тюменской свиты Красноленинского месторождения».Нефтяное хозяйство11’2015г., стр 22–26.
    [Google Scholar]
  2. 1.Emel’yanovD.V., ZharkovA.V., SmirnovD.S., et al., Modern approaches to support drilling of horizontal wells in facies-unstable low permeable reservoirs of Tyumen suite of Krasnoleninskoye field (In Russ.), Neftyanoe khozyaystvo=Oil Industry,2015,no.11, pp.22–26
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.202154037
Loading
/content/papers/10.3997/2214-4609.202154037
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error