Full text loading...
-
Construction of Extended-Reach Wells (Bottomhole More Than 6000 m) in the North of the Perm Region
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, Horizontal Wells 2021, May 2021, Volume 2021, p.1 - 5
Abstract
Summary
The results of drilling extended reach wells at one of the fields in the north of the Perm region are presented. The substantiation of the choice of the well design and the extended profile taking into account the peculiarities of the geological structure of the field is given. The problems that arose during the construction of the well and their solutions are described. The relevance of individual design of construction of extended reach wells is noted.
© EAGE Publications BV