Abstract

Summary

In the age of digitalization and artificial intelligence, the main challenge is to provide a cross-functional integration: any updated data have to be considered by all team in order to reduce risk, time and cost. This article introduces case of drilling horizontal wells with integrated approach to optimize drilling performance in Eastern Syberia which reduced drilling time more than twice. Geomechanical model was used as integration tool of geophysical, drilling, logging, coring, testing and fracturing data.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202154069
2021-05-24
2024-03-29
Loading full text...

Full text loading...

References

  1. 1.Vorobyov, V.S [2017] Advantages of Horizontal Exploration Wells in Regions with Complex Geology, Hosizontal Wells 2017 Problems and Perspectives, 2nd Science-Practical Conference
    [Google Scholar]
  2. 2.Bassey, A., Dosunmu, A., Otutu, F. et al. [2016] Borehole Stability Management Using the New Mudweight Window Concept; A Case Study of Well KTY 02, KTY 03 and KTY 04. SPE 184279-MS
    [Google Scholar]
  3. 3.JohnMitchell [2014] Trouble-Free Drilling Stuck-Pipe prevention 3rd Edition, Drillbert Engineering Inc.
    [Google Scholar]
  4. 4.Gil, I. and Roegiers, J.C. [2002] Borehole Design: Stability Considerations. SPE ISRM Rock Mechanics Conference, 20–23 October 2002.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.202154069
Loading
/content/papers/10.3997/2214-4609.202154069
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error