f De-risking Existing Plugged and Abandoned Wells via Site Inspections for Field a Ccs Project In Malaysia
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, EAGE Workshop on Unlocking Carbon Capture and Storage Potential, Aug 2023, Volume 2023, p.1 - 2
Abstract
Summary
Site inspections via geophysical surveys and ROV inspections conducted able to assist in de-risking wells integrity risk thus reducing the risk of CO2 leakage in storage site.
This is part of the work done to justify if existing legacy wells able to withstand CO2 injection environment later during CCS phase. Currently there’s not much work being done for this legacy well integrity site inspection specific for CCS purposes.
- 17 Aug 2023