1887

Abstract

Summary

Managing thin oil rim reservoir with extensive years of production pose as a great challenge due the dynamic movement of fluid contacts that is sensitive to reservoir pressure, depletion and production strategy. In this case study, a brownfield in offshore Sarawak was observed to attain uneven current fluid contacts after more than 40 years of production. Prudent efforts integrating time-lapse surveillance plan and reservoir simulation model updates were successfully executed to de-risk the tilted fluid contacts in recent drilling campaign involving 4 horizontal wells. The positive result encountered is testament to the robustness of the integrated reservoir model and opening further development opportunities as well as better management of the thin oil rim reservoir.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202477151
2024-11-20
2026-02-08
Loading full text...

Full text loading...

References

  1. Masoudi, R., Karkooti, H., and OthmanM. [2013] How to Get the Most Out of Your Oil Rim Reservoirs?International Petroleum Technology Conference, Beijing, China. doi: https://doi.org/10.2523/IPTC-16740-MS
    [Google Scholar]
/content/papers/10.3997/2214-4609.202477151
Loading
/content/papers/10.3997/2214-4609.202477151
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error