Life of Mine planning is a critical process for mining company, that ensures the economic viability over the entire life of a mining project. With Life of Mine Plan, a company can predict potential operational and financial risks, providing the sustainable and profitable operation over the life of the mine period. Micromine Beyond Optimiser uses the Lehrch-Grossman algorithm to generate a Life of Mine Plan based on nested pit shells and pushbacks based on defined parameters and mining scenario.

Life of Mine Plan preparation is demonstrated on the example of open-pit mines, but the Micromine Beyond Optimiser has similar tools for underground mines.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.2025510170
2025-04-14
2026-02-11
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2025/monitoring_2025/Mon25-170.html?itemId=/content/papers/10.3997/2214-4609.2025510170&mimeType=html&fmt=ahah

References

  1. Altinpinar, M.A (2021). Quick Guide to Developing a Mine PlanPredictive Geometallurgy and Geostatistics Lab, Queen's University Annual Report, Paper 2021–06, 61–78. https://geomet.engineering.queensu.ca/wp-content/uploads/2021-06-Mehmet-Altinpinar-A-Quick-Guide-to-Developing-a-Mine-Plan.pdf
    [Google Scholar]
  2. Anisimov, O., Bariatska, N., & Cherniaiev, O. (2023, November 8–10). Strategic planning of open pit mining operations using the Micromine Beyond Optimiser. V International Conference “Essays of Mining Science and Practice” Dnipro, Ukraine. DOI: 10.1088/1755‑1315/1348/1/012005
    https://doi.org/10.1088/1755-1315/1348/1/012005 [Google Scholar]
  3. Bariatska, N. (2023, November 9–12). Reserve Estimation During (Pre)Feasibility Study of Mineral Projects Using Micromine Pit and Stope Optimizers. Conference Proceedings, 17th International Conference Monitoring of Geological Processes and Ecological Condition of the Environment, 2023, 1–5. DOI: https://doi.org/10.3997/2214-4609.2023520060
    [Google Scholar]
  4. BreedM. F. & HeerdenD. (2016) Post-pit optimization strategic alignmentThe Journal of the Southern African Institute of Mining and Metallurgy, 166, 109–114 DOI:10.17159/2411‑9717/2016/v116n2a1
    https://doi.org/10.17159/2411-9717/2016/v116n2a1 [Google Scholar]
  5. Lerchs, H. & Grossman, F. (1965). Optimum Design of Open-Pit Mines. Transaction, CIM. LXVIII, 47–54.
    [Google Scholar]
  6. Mousavi Nogholi, A. A. (2015). Optimisation of Open Pit Mine Block Sequencing. Submitted in fulfilment of the requirements for the degree of Doctor of Philosophy. Corpus ID: 109318886
    [Google Scholar]
  7. Otto, T.J. & Musingwini, C. (2019). A spatial mine-to-plan compliance approach to improve alignment of shortand long-term mine planning at open pit mines. The Journal of the Southern African Institute of Mining and Metallurgy, 119, 253–259. http://dx.doi.org/10.17159/2411-9717/2019/v119n3a4
    [Google Scholar]
  8. Songolo, M. (2010). Pushback Design using Genetic Algorithms. A thesis for the award of the degree of Master of Engineering Science in Mining of Curtin University. DOI: 10.13140/2.1.4065.6169
    https://doi.org/10.13140/2.1.4065.6169 [Google Scholar]
/content/papers/10.3997/2214-4609.2025510170
Loading
/content/papers/10.3997/2214-4609.2025510170
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error