1887

Abstract

Summary

In this paper, we discuss the use of a single multi-purpose vessel to acquire an OBN survey efficiently. The hybrid vessel is capable of deploying nodes with ROV and has a complete seismic source. These features, coupled with small nodes with a long battery life, means the vessel can deploy nodes, acquire the shot carpet and retrieve the nodes. This is demonstrated in a case study where such a survey was conducted over 20 days.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.2025647014
2025-11-24
2026-02-11
Loading full text...

Full text loading...

References

  1. Hager, E., Combee, L, Jaavold, V. and Husom, V., “The Making of a Node”, First Break, November 2022
    [Google Scholar]
/content/papers/10.3997/2214-4609.2025647014
Loading
/content/papers/10.3997/2214-4609.2025647014
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error