The full final Garraf field development will consist a total of ‘X’ wellpad which is generic design to each other. At the moment, ‘X’ that has already completed the construction and some are still under construction stage. The development concept grouped the wells in cluster enables each wellpad to consist a maximum of 28 wells in one location.

The major successful wellpad development contributes by the skidded drilling rig, trenches for piping flowlines, automated multiport flow selector skid and high-integrity pressure protection system. It is also supported by effective management strategy on having stock for the essential material as a back-up plan for any delayed in material delivery.

Finally the whole success was mainly due to the good synergies between Project & Engineering and Drilling team to enable both team to work in parallel as a team to bring wells into commercial production. Through close coordination between both parties, the Early Oil Scheme (EOS) was introduced as an initiative to produce the wells right after well handover from the Drilling team. This has resulted in early oil production for several days ahead of schedule.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201414367
2015-11-16
2024-04-26
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2015/third-ws-iraq/IR20.html?itemId=/content/papers/10.3997/2214-4609.201414367&mimeType=html&fmt=ahah
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201414367
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error