1887

Abstract

Pressure measurement plays a critical role in the<br>development and management of compartmentalized<br>reservoirs. Conventionally, pressure data have been<br>recorded using wireline formation tester (WFT) tools. In<br>highly deviated or horizontal wells, wireline testers must<br>be conveyed on drill-pipe at considerable expense and<br>often with operational risk and limitations.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11249
2007-12-04
2024-12-08
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.147.iptc11249
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error