1887

Abstract

The first ever compartmentalized flow profiling job in a horizontal developmental well in India was a success as a result of<br>seamless completion design, pre-job, on-job and post-job planning and job coordination. The completion strategy of the well<br>was the core contributor for the success of the well.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13066
2009-12-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13066
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error