1887

Abstract

Samarang field is a 35 year-old oilfield offshore Malaysia that<br>was initially developed by Shell beginning in 1975. The field<br>was relinquished to Petronas Carigali Sdn Bhd (PCSB) in<br>1995, which continued field operations and were able to<br>significantly reduce the production decline rates.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13162
2009-12-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13162
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error