1887
PDF

Abstract

The Al Rayyan field came on production in 1996, and has from the outset been completed with coil tubing deployed<br>ESPs (CT ESP). The drivers for this type of completion are several. Firstly economic, as these units are installed and<br>pulled using coil tubing with a CT unit permanently located on the platform. This results in significant savings in not<br>requiring a rig, and greatly reduces deferred production losses as no significant mobilization activity is required.<br>Production rates are such that the necessary annular flow can be achieved in 9-5/8C_" casing.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13675
2009-12-07
2024-04-27
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13675
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error