1887

Abstract

The Upper Cretaceous Mishrif reservoir in Minagish field is currently being developed by Kuwait Oil Company (KOC) using<br>a horizontal drilling program. The Mishrif reservoir is approximately 300 ft thick across the field, with an average net pay of<br>170 ft in the upper layers.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13875
2009-12-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.151.iptc13875
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error