-
oa Identification of poor ground with the aid of DC-resistivity: Results from work on the Öresund bridge connections
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, 3rd EEGS Meeting, Aug 1997, cp-95-00111
- ISBN: 978-94-6282-128-6
Abstract
Together with large investments in the connecting land infrastructure the construction of the 16 km-long coast to coast Öresund link between Copenhagen and Malmö is now underway. Construction works were initiated in 1994 and the link is scheduled to be inaugurated around the year 2000.