1887
PDF

Abstract

Rantau structure is located in north Sumatra basin of Indonesia, with the main hydrocarbon producing layer from Keutapang, has 33 productive layer and divided into 11 compartment (A1, A2, B, C1, C2, D1, D2, D3, D4, E1 dan E2) and has 580.25 MMbbl remaining oil in place. Rantau structure start produced in 1929, total number of wells already drilled 558. Peak primary oil production occurred in 1969 with 31,711 bopd. The oil was produced from primary stage to secondary stage on several layers and blocks. The secondary stage has been started with injecting water since 1984 with peripheral pattern and successful increasing oil production from secondary recovery until 5,500 bopd in 1988 from the previous condition 2,550 bopd in 1984 with source of water injection from sea water that has water salinity 26000-33000 ppm, this poor water injection quality directly impact problems for injection wells (plugging) and declining oil production until 2300 bopd in 1997. To increase or optimization oil production from potential layers or blocks, that some of them was not impact by secondary recovery in 1984. Water production is the main issue that can impact directly to oil production, manage water production and get more additional production from potential layer that some of them was not impact by secondary recovery from 1984. EOR division Pertamina EP planned for pilot water flood on 3 potential layers (600, 400, 770 & 800), upgrading injection & production facility (water for injection comes from water produce and treated before inject into the reservoir) and EOR stage on layers and blocks that in 1984 already impact by water injection. Kick off pilot water flood had been done in January 2010 with irregular 5-spot pattern in layer 600 and successful increase reservoir pressure and oil production until 400-500 bopd (after 3-4 months injected) from 2 producer wells form the previous condition 20 bopd. From the prediction with reservoir simulation additional reserve form full-scale water flood in 3 potential layers (600, 400, 770 & 800) can get maximum 11.65 MMbbl and additional reserve from chemical flood 6.83 MMbbl (layer 600), but for the long term EOR division Pertamina EP will be screening and restudy all production layer, because remaining oil in place still potential to optimize with secondary and EOR stage.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20143590
2012-05-02
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20143590
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error